Projects
Click on image to reveal works completed.
MY Ronin 58m Lurssen
Complete new paint works of superstructure and hull topsides. Sand sweep hull to base primers and apply new antifoul system.
Main engines service and overhaul. Engine room engineering including exhausts repairs and modifications, pipe-works. Replace hull plating.
Propeller works including testing, analysing, balancing and adjustment. Teak deck works
28m Mini Explorer vessel
Carried out and conducted stability studies and inclination measurements, Design of new deck additions. Removed sections of bridge deck aft and sun deck aft.
Manufacture 2 new deck extensions and attached to vessel. Upper deck extension to be used as heli-pad.
Major engine room pumps and systems service. Sand blast hull and new antifoul system.
Stabiliser systems service.
MY Slipstream 60m CMN
General commissioning throughout, warranty paint areas, engine room pipe work, flow sensors, electronics and electrical refining and modifying, tanks gas freed and cleaning, HEM water works, multiple storage, prop shaft seals, Teak deck works, engines paint, hydraulics works.
MY Cloud 9 60m CMN
Engine room pipe works, flow meters, interior cabinetry, french polishing interior, stainless metalworks, various support & storage systems in metal and wood, soft interiors, general commissioning throughout, warranty paint works, engines paint, tender launching system, refining various systems, ASEA shore power converters.
MY Kiss the Sky 52m Amels
Removal & fit new generators. New main engines & generators exhausts, new engine management system, air start to electronic start, new compressors, new HEM water treatment, Stabilizers removal & overhaul, main engines overhaul, engine room re-paint, new AV / IT systems, interior fine cabinetry, french polishing interior, new awnings, ac system service, sand blast hull to primer, new anti-foul system, new 1 meter swim platform extension, teak deck works, safety equipment service and certified, tanks gas freed & cleaned, soft interior works, prop analysis & balance, new topsides paint, all to Lloyds classification where required.
MY Achilles 55m CRN
Stabilizers removal & overhaul, rudder removal and bearing works, engine room pipe works, ac system, main engine exhaust repairs, fresh water system pipe works, bow thruster removal and overhaul, davits service, hydraulic works, french polishing interior, new General Arrangements, docking plans & safety plan drawings, teak deck works, fire damper installed, interior plumbing & bathroom works, soft interiors, superstructure paintworks, tanks gas freed and cleaned, anti-foul system applied, interior fine cabinetry, tenders & jet ski’s service, safety equipment service and certified, all to Lloyds specification where required.
SY Ran 22m Carbon Racing Yacht
Specialist works to enable yacht to continue training and racing.
SY Nirvana 53m Vitters
Warranty paint works to maintain this award winning yachts pristine condition, stainless metal works composite pipe repairs.